US Steel Building Project
Posted on: February 5th, 2015
Installation of 1600’ of 12” and 400’ of 4” plastic natural gas main in Downtown Pittsburgh in order to provide service to the US Steel Tower. This project in the heart of Pittsburgh also included surface restoration of necessary roadways and sidewalks.
For: Peoples Natural Gas